Step 1: Surface Preparation – The Foundation for Success

Ensuring a solid foundation is paramount for successful tile installation. Tiles can be installed on structurally sound substrates that are clean, smooth, dry, and devoid of wax, soap scum, or grease. Repair any damaged, loose, or uneven areas by patching and leveling. Eliminate potential obstacles such as moldings, trim, and appliances. Optionally, undercut door jambs to allow tiles to slip underneath seamlessly.

Step 2: Layout – Crafting Symmetry

  1. Mark the center point of all four walls.
  2. Snap chalk lines between the center points of opposite walls, intersecting at the room’s center. Ensure the lines are perfectly square.
  3. Lay out loose tiles along the center lines in both directions, leaving spaces for uniform joints with tile spacers.
  4. If cuts at walls are smaller than half a tile, adjust the center line accordingly.
  5. Divide the room into smaller grids (approximately 2′ x 3′) by snapping additional lines parallel to center lines.

Step 3: Applying Adhesive – Bonding Ritual

  1. Select the appropriate adhesive, following instructions and precautions.
  2. Mix enough adhesive for 30 minutes of use.
  3. Spread a 1/4″ coat on one grid area, using the recommended trowel and the flat side.
  4. Do not cover guidelines. Comb adhesive into standing ridges at a 45-degree angle with the notched side.
  5. Remove excess adhesive, leaving a uniform, ridged setting bed. Avoid spreading an area larger than can be set in 15 minutes.

Step 4: Cutting Tile – Precision Crafting

  1. Measure tiles carefully and mark with a pencil or felt-tip pen.
  2. Use a tile cutter for straight or diagonal cuts, a nipper for curved cuts, and a rod saw for full-length curved cuts.
  3. Smooth sharp-cut edges with a carborundum stone.

Step 5: Setting Tile – Building Symmetry

  1. Mix tiles from different cartons to accommodate shade variation.
  2. Begin installing tiles in the room’s center, one grid at a time. Finish each grid before moving to the next.
  3. Set tiles one at a time with a slight twisting motion. Avoid sliding tiles into place.
  4. Insert tile spacers or leave equal joints between tiles.
  5. Fit perimeter tiles last, leaving a 1/4″ gap between the tile and the wall.
  6. Tap in all tiles with a rubber mallet or hammer and wood block for a good bond and level plane.
  7. Remove excess adhesive from joints with a putty knife and from tiles with a damp sponge. Avoid walking on tiles until set (usually in 24 hours).

Step 6: Grouting Joints – The Culmination

  1. Wait approximately 24 hours before grouting (refer to adhesive package for specifics).
  2. Follow grout package instructions diligently, making enough for 30 minutes of use.
  3. Remove tile spacers and spread grout on the tile surface, forcing it into joints with a rubber grout float or squeegee.
  4. Tilt the float at a 45-degree angle, removing excess grout immediately.
  5. Wait 15-20 minutes for the grout to set slightly, then use a damp sponge to clean grout residue and smooth joints.
  6. Rinse the sponge frequently and change water as needed.
  7. Let grout dry until hard, forming a haze on the tile surface. Polish with a soft cloth.
  8. Rinse again with a sponge and clean water if necessary.
  9. Wait 72 hours for heavy use. Avoid applying sealers or polishes for three weeks, following manufacturer’s recommendations thereafter.